• RU
  • UA

    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
        • Current Projects
        • Completed Projects
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
    The full-scale war of russia against Ukraine 01 May 2023
    Громов Юрій Миколайович 25 January 2023
    Нікітін Анатолій Іванович 13 January 2023
    Купний Валентин Іпполітович 04 January 2023
    Билык Андрей Александрович 12 December 2022
    28 January 2019

    SSE ChNPP panoramic pictures

    • Print
    • Email

    180°

    New Safe Confinement from inside (2019)

    Turbine Hall (2018)

    Outdoor switchyard (2018)

    Cooling pond (2018)

    ChNPP and cooling pond (2018)

    ChNPP from 25-m switchyard’s watch tower (2017)

    ChNPP from ISF-2 roof (2017)

    All ChNPP Units from Building 81 passageway (2017)

    ISF-2 construction site (2017)

    ChNPP site from Industrial Heating Plant’s roof (2017)

    Cooling pond (2017)

    ChNPP from cooling pond (2017)

    ChNPP from cooling pond (2017)

    Industrial Heating Plant (left) and water channel (2017)

    ChNPP Units after sliding of New Safe Confinement’s Arch (2017)

    NSC’s erection area (2017)

    ChNPP during construction of NSC’s Arch (2016)

    New Safe Confinement from inside (2016)

    Interim Spent Nuclear Fuel Dry-type Storage Facility (ISF-2) (2016)

    Administrative building and bypass channel (2016)

    Control room of destroyed Unit 4 (2016)

    New Safe Confinement from inside (2015)

    ChNPP and NSC from bypass channel’s bridge (2014)

    Unfinished ChNPP Units 5 and 6 (2014)

    Cooling pond (2008)

    Outdoor switchyard and NSC from bypass channel’s bridge (2014)

     

    360°

    ChNPP and cooling pond (2016)

    Unit 3 control room (2016)

    Unit 3 Central Hall (2016)

    New Safe Confinement from inside (2016)

    New Safe Confinement from inside (2016)

    New Safe Confinement and Shelter Object (2016)

    Prypiat town (2016)

    Cooling pond (2017)

    Nearest Events

    June 11, 2001 – establishment of SSE Chernobyl NPP

    News distribution

    Copyright © 2023 Чорнобильська АЕС. All Rights Reserved.
    Joomla! is Free Software released under the GNU General Public License.
    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
        • Current Projects
        • Completed Projects
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
        • Повідомити про корупцію
      • План діяльності системи енергетичного менеджменту
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
      • Культура захищеності