|
New Safe Confinement from inside (2019)
|
|
Turbine Hall (2018)
|
|
Outdoor switchyard (2018)
|
|
Cooling pond (2018)
|
|
ChNPP and cooling pond (2018)
|
|
ChNPP from 25-m switchyard’s watch tower (2017)
|
|
ChNPP from ISF-2 roof (2017)
|
|
All ChNPP Units from Building 81 passageway (2017)
|
|
ISF-2 construction site (2017)
|
|
ChNPP site from Industrial Heating Plant’s roof (2017)
|
|
Cooling pond (2017)
|
|
ChNPP from cooling pond (2017)
|
|
ChNPP from cooling pond (2017)
|
|
Industrial Heating Plant (left) and water channel (2017)
|
|
ChNPP Units after sliding of New Safe Confinement’s Arch (2017)
|
|
NSC’s erection area (2017)
|
|
ChNPP during construction of NSC’s Arch (2016)
|
|
New Safe Confinement from inside (2016)
|
|
Interim Spent Nuclear Fuel Dry-type Storage Facility (ISF-2) (2016)
|
|
Administrative building and bypass channel (2016)
|
|
Control room of destroyed Unit 4 (2016)
|
|
New Safe Confinement from inside (2015)
|
|
ChNPP and NSC from bypass channel’s bridge (2014)
|
|
Unfinished ChNPP Units 5 and 6 (2014)
|
|
Cooling pond (2008)
|
|
Outdoor switchyard and NSC from bypass channel’s bridge (2014)
|