Enterprise Structure

Top management of SSE “Chornobyl NPP”:

Acting General Director of SSE "Chornobyl NPP" - Valeriy Seyda. 

He was born in 1963 in Taiga city, Kemerovo region (Russian Federation).

In 1989 he was graduated from Tomsk Polytechnic Institute with a degree in physical and energy facilities, a physics engineer.

After graduation since April 1989 he is working at Chornobyl Nuclear Power Plant. He started his working experience as health physicist in Radiation Safety Shop and come up through the ranks to become the First Deputy General Director for Planning and Decommissioning.

Since September 4, 2018 he is Acting General Director of SSE "Chornobyl NPP".

 

 

 

 

 

 SSE “Chornobyl NPP” Technical Director (-Chief Engineer) — Andrii Bilyk

Andrii Oleksandrovych Bilyk was born in 1964 in Zlatoust town, Chelyabinsk Region (Russian Federation).

Higher education: physics engineer of physic and power generating facilities.

Since 1987 he has been working at the Chornobyl NPP and held positions of reactor control engineer, Unit control engineer, Plant deputy shift supervisor, Plant shift supervisor, Deputy Chief Engineer for safety and radiation protection, Chief Engineer.

Since September 2005 – Technical Director (-Chief Engineer) of SSE "Chornobyl NPP".

 

 

 

 

Complete structure of the enterprise can be downloaded here.

Total quantity of SSE “Chornobyl NPP” personnel – 2,341 persons, among them 1,705 men and 636 women.

Dynamics of personnel quantity change: