Nearest Events

On November 29, 2016, the installation of the NSC Arch into the design position over the Object Shelter was completed
30 November, 1996 – Unit 1 was finally shutdown

ChNPP Radiation Monitoring


2021-11-28 01:12:00
Units - µSv/h
Temperature: -0.8 °C
Relative humidity: 98 %
Pressure: 726 мм рт.ст.
Wind speed: 0.0 м/c
Wind Direction: СВ - 37°

Comprehensive radiation monitoring system of Chornobyl Exclusion Zone

News distribution