Часть 1
Часть 2
Часть 3


| November 17, 2001 ChNPP was assigned as the operating organization (operator) of Chornobyl NPP’s nuclear installations |
| On November 29, 2016, the installation of the NSC Arch into the design position over the Object Shelter was completed |