Foundations of installation area
- Installation of temporary shielding.
-
Reinforcement.
-
Installation of shuttering.
-
Concreting. Concrete B50 (106m3).

2. Arrangement of foundations in transport area
-
Works weren’t performed

3. Arch
-
Geodesic checking of metal constructions.
-
Dismantling of anchor block, installation of jack steel wire ropes.
-
Preparation for jacking beams dismantling.
-
Dismantling of lifting towers containers
-
Physical works on shuttering installation weren’t performed.