• UA

    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
    1. Infocenter
    2. News
    3. Work Progress at ISF-2
    17 May 2019

    Work Progress at ISF-2

    • Print
    • Email

    On May 6, the main stage of Spent Nuclear Fuel Dry Storage Facility (ISF-2) integrated testing with use of spent fuel assembly (SFA) dummies started at the ChNPP industrial site.

    The testing includes the receiving of a railcar from ISF-1, processing of 9 dummies (namely detaching the lower and upper spent fuel bundles, inserting the dummies into the fuel storage tubes and double-wall shielding canisters (DWC)). The SSE ChNPP personnel participate in the ISF-2 integrated testing while the representatives of the SNRIU and the SSTC NRS witness this testing.

    The completed individual testing of the majority of systems, namely main process systems for handling a transfer cask, SFAs, fuel storage tubes, DWCs etc. enabled to carry out this stage of testing.

    From May 18, within the framework of ISF-2 integrated testing with dummies it is scheduled to carry out the primary procedure qualification of welding technique which will be used for DWC handling.

    Simultaneously with ISF-2 integrated Testing with dummies, the operational trial of process video surveillance system and process control and monitoring system are carried out.

    During the subsequent two stages of ISF-2 integrated Testing with SFA dummies it is planned to conduct the trials associated with liquid and solid waste management systems, “hot cell” ventilation system. Moreover, the maintainability of “hot cell” equipment will be checked. In the course of these operations, an additional crane trolley of the main crane will be used in Room 501. Entirely, all three stages of ISF-2 integrated testing with SFA dummies are scheduled to complete till the end of June 2019.

    Copyright © 2025 Чорнобильська АЕС. All Rights Reserved.
    Joomla! is Free Software released under the GNU General Public License.
    • Home
    • About
      • History of the ChNPP
        • Construction and Operation
        • Accident and its Elimination
        • Post-accident operation and shutdown
        • The full-scale war of russia against Ukraine
      • ChNPP Structure
    • Infocenter
      • News
      • Photos
      • Unofficial
      • Literature
    • Activity
      • ChNPP Decommissioning
      • Shelter object transformation
        • New Safe Confinement
      • Radioactive Material Management
        • Radioactive Waste Management
        • Spent Nuclear Fuel Management
      • International Technical Assistance Projects
      • ICCA Procurement
        • Повідомити про корупцію
      • План діяльності системи енергетичного менеджменту
    • Contacts
    • Partners
    • Visit Chnpp
      • Technical visits and Mass media
      • Information Visits
      • Культура захищеності