On November 30, ChNPP specialists participated in Round Table “Challenges of Fuel Containing Material Management”
For information
Fuel containing materials are the nuclear fuel of Chornobyl NPP former Power Unit 4 damaged due to the beyond-design-basis accident, fuel assemblies of Power Unit 4 spent fuel pool bundles and any other materials (pieces of reactor core, mixtures, corium, solutions, chemical compounds, dust etc.) containing the appreciable amount of nuclear fuel (i.e. its concentration is ≥ 1 of weight percent).
Fuel containing materials of Shelter facility are long-lived radioactive waste. The most famous example of fuel containing material is so called “elephant foot”.


In mid-November, two emergency drills were held at ChNPP. Two different facilities were chosen as training sites: Spent Fuel Storage Facility No. 1 and the Liquid Radioactive Waste Treatment Plant.
On November 22, a high-level opening event took place in virtual mode to kick off a series of activities on mental health support for operating personnel of NPPs in Ukraine.
On 14 November, the personnel of the Chornobyl NPP office in Slavutych participated in the special facility training. The drill involved employees following a designated route to reach radiation shelters, simulating actions in case of emergencies.