The Chornobyl NPP received a Certificate from the State Architectural and Construction Inspectorate of Ukraine, confirming that the constructed facility “New Safe Confinement (NSC). Commissioning Stage No.1 (CS-1). Licensing Package No.6 (LP-6). Protective structure with technological life support systems and necessary infrastructure” is in compliance with the design documentation, and the Certificate confirmed its readiness for operation.
All works under the NSC project were subdivided into six Licensing Packages (LP). Five of them were already completed. These included site cleanup for the future NSC construction site, arrangement of the foundations and an Arch assembly platform, steelwork, cladding and major Arch equipment, in particular the Main Cranes System.
LP-6 is one of the main construction packages for the New Safe Confinement, which included the integration of the entire NSC project into an integrated complex with internal systems.


On July 29, a contract was singed for civil works related to New Safe Confinement facility (NSC). Commissioning Stage 2 (CS-2). Dismantling the unstable structures of the SSE ChNPP Shelter in terms of “early” dismantling. The signatories are the SSE Chornobyl NPP and
On July 24, the Cabinet of Ministers of Ukraine amended "The Grant Agreement (Chornobyl Nuclear Safety Project) between EBRD, Cabinet of Ministers and State Nuclear Regulatory Committee of Ukraine" dated 8 July, 2009.
On July 8, the industrial operation of the Liquid Radioactive Waste Treatment Plant (LRTP) was resumed. For a week of operation in this mode, 34 packages of end product were prepared at the plant. After 28 days of holding, the RAW packages will be transferred for disposal at the engineered near-surface disposal facility for solid radioactive waste.
A final meeting of the Assembly of Chornobyl Shelter Fund (CSF) Contributors and a regular meeting of the Assembly of the Nuclear Safety Account (NSA) Donors took place in Kyiv on July 9, 2019. The Ukrainian delegation at these Assemblies was represented by the Minister of Ecology and Natural Resources of Ukraine Ostap Semerak, Head of the State Agency of Ukraine on Exclusion Zone Management (SAUEZM) Vitalii Petruk, Acting Director General of the State Specialized Enterprise “Chornobyl NPP” Serhii Kalashnyk, and Chairman of the State Nuclear Regulatory Inspectorate of Ukraine (SNRIU) Hryhorii Plachkov.